past / High
HVYWGHT: dBridge + more
伦敦 HVYWGHT 首次来到上海,由 Exit Records 主理人 dBridge 领衔。ONEFORTYASIA 阵容接力 UK bass 与 soundsystem 的低频脉络。
DateOct 10
Time22:00–次日04:00
VenueILLUM
SoundBass / Club
TicketArchived
Sourcecurrent-public-source
PriceEarly bird RMB118 / presale RMB138 / door RMB158
DistrictChangning
AddressLG Floor, C·PARK, 658 Zhaohua Road, Changning, Shanghai
Age / ID18+
Ticket readinessPast event
Source layercurrent-public-source
Intensityhigh
Credibilitystrong
Event Tags
Simple tags for sound, room context, ticket/source status, and details that still need a source check.
How We Recommend This
- RecommendationRecommended because the lineup (dBridge, Siesta, and 2 more listed artists) gives the night a clear bass, breaks, 140, or UKG draw at ILLUM.
- Best forListeners interested in the stated sound and performance format.
- Verify before goingRA 2548769 为同一日期、场地和主艺人的重复刊登,已合并。
- Source confidenceSource-backed with 2 attached public sources; key facts should still be checked close to the event date.
Lineup and Notes
- dBridgeLineup listed by the event source; exact set time may still need venue confirmation.
- SiestaLineup listed by the event source; exact set time may still need venue confirmation.
- SanliLineup listed by the event source; exact set time may still need venue confirmation.
- Eva1nssLineup listed by the event source; exact set time may still need venue confirmation.
- D8Lineup listed by the event source; exact set time may still need venue confirmation.
- DiipsetLineup listed by the event source; exact set time may still need venue confirmation.
- SOMEBODYYYYLineup listed by the event source; exact set time may still need venue confirmation.
- MungkLineup listed by the event source; exact set time may still need venue confirmation.
- Cannon boyLineup listed by the event source; exact set time may still need venue confirmation.
- Big WaveLineup listed by the event source; exact set time may still need venue confirmation.
Source Trail
- promoter-managed-event-page current-public-source / checked 2026-10-07
- RA organizer listing current-public-source / checked 2026-10-10
Trust Ledger
- Last checked2026-10-10
- Selection basisIncluded for source visibility, room fit, and these editorial signals: strong techno fit, warehouse signal, listening/live angle.
- Commercial relationshipNo paid placement recorded.
- Correction routeSend source fixes through RED 980793145 or the corrections policy.
- PolicyHow We Recommend / Corrections